What might the Musselburgh Flood Protection Scheme look like? We’ve gathered images from Selkirk and Hawick, where the flood protection schemes were delivered by the same designers, contractors and consultants as the Musselburgh Flood Protection Scheme.

(scroll down for Hawick Flood Protection Scheme images)

Selkirk Flood Protection Scheme

This project was delivered by the same contractor and consultant as the Musselburgh Flood Protection Scheme and completed in 2017 at a cost of £31.4 million.

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Selkirk Flood Protection Scheme

Hawick Flood Protection Scheme

Originally estimated at £28m in 2013 for the initial flood protection work, it ballooned to £106.5m on completion in 2025, partly due to pandemic-related delays, but also because, like Musselburgh, it was expanded be a ‘4-in-1’ project incorporating walking and cycling routes and infrastructure upgrades. Unlike Musselburgh, Hawick experiences regular flooding.

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme

Hawick Flood Protection Scheme